EDMS in project document hand-over

Benefits of document hand-over among EPC contractor, Owner/Operator and other sub-contractors.

Project document hand-over plays an as important role as project start, planning, execution and management.

This phase is generally overlooked due to no attention paid to appropriate document hand-over and receiving. It is also underrated during the whole project execution. However, document hand-over turns out to be important as all the documents will be filtered to be closest to as-is plant.

  • Basic design;
  • Detailed design;
  • As-built documents;
  • QA/QC documents;
  • Vendor documents;
  • Operating procedures;
  • Maintenance manuals;

Additionally, hand-over will help managers have all the information of the project from a truthful source.

  • As-built documentation: The documents are classified into disciplines, phases, revisions and changes.
  • Electronic database: EDMS is built to support classification, categorization, query and reports (technical design, contracts, equipment data from suppliers, etc.,). All of them are organized in processes and numbering systems as agreed among project participants.
  • Revision Management: Document/drawing completion and finalization are stored in the common database, including document sponsor, reviewer, approver, comments or changes among EPC contractors and sub-contractors.
  • Information & Knowledge: As-built documents are critical as they help Owner/Operator build up operating procedures, training programs and inputs into other systems like safety, MES, CMMS, EAM and Registration management system.

Owner should receive full document set from contractors. Technical and other project documents should be handed over in the full and most reliable way. Application of the EDMS system can help this by using its built-in functions.

Back

Related Post

Introduction of common maintenance types

Asset management and equipment maintenance are today critical in the digital transformation of plant operation. Each industry as in Manufacturing, Oil & Gas, Energy, Food...

You may be interested

SEE MORE

GIS-based asset and infrastructure management

The assets of the enterprise are scattered over many geographical areas, which will make it difficult to manage assets as well as keep a close eye on the work schedule. Geospatial-based asset, equipment...

FaceID for time attendance systems

The requirement to keep distance and limit contact in the factory (5K message) is mandatory to limit the risk of disease spread and ensure production operations. One of the locations that are often crowded...

Project progress and cost management with Primavera

Managing problems in different aspects in the project implementation process, such as schedule, costs, resources, budget, etc., using the same solution tool will help the Investor or the enterprise to plan...