Construction Management, Urban development and Infrastructure / Consultant

Building Information Modeling.

[section label=”Banner” padding=”0px” class=”page_detail_banner category_banner”] [page_header style=”normal” text_color=”dark” show_title=”0″ nav_size=”xxsmall” class=”page_wrapper_header_mb” visibility=”show-for-small”] [ux_banner bg=”98595″ bg_size=”original” bg_overlay=”rgba(0,0,0,.5)” bg_overlay__sm=”rgba(0,0,0,.5)” bg_pos=”0% 23%”] [text_box text_color=”dark” width=”50″ width__sm=”90″ position_x=”5″ position_y=”50″ text_align=”left”]

Construction Management, Urban development and Infrastructure / Consultant

Building Information Modeling.

[button text=”Contact Us” letter_case=”lowercase” link=”/contact-/”] [/text_box] [/ux_banner] [/section] [section class=”advantages”] [row class=”advantage_paragraph”] [col span__sm=”12″]

BIM is compulsory in construction projects in the world and region like Singapore. In Vietnam, BIM has been studied and introduced by design consultants and engineers in their construction and infrastructure projects. BIM helps owners and contractors manage their projects in diversified dimensions like design, progress, costs, recourses, contract, estimation, etc. This helps users to control their projects on a real-time base.

[/col] [/row] [row label=”slide chi tiết giải pháp” class=”detail_slide_advantages”] [col span__sm=”12″]

Modeling

Visualize the projects for stakeholders to understand for discussion, work assignment or selection of appropriate design/construction.

Information sharing

Co-ordinate activities, saving time in document preparation and information exchange.

Clash check

Reduce changes, modifications or additions during project execution.

Project volume and progress

Connect the model with real work progress and control costs from BOMs on the model.

Information management

Manage information about equipment, machinery, piping, structure, etc., for later plant maintenance and operation.

[/col] [/row] [/section] [section label=”Project” padding=”0px” class=”detail_casestudy detail_solutions_casestudy”] [row] [col span__sm=”12″] [row_inner] [col_inner span__sm=”12″] [blog_posts style=”normal” type=”row” columns=”3″ columns__md=”1″ ids=”99676″ readmore=”Read more” show_date=”false” excerpt_length=”30″ image_height=”56.25%” text_align=”left” class=”detail_casestudy”] [/col_inner] [/row_inner] [/col] [/row] [/section]